Environmental activists built a cabin on trees on the route of the future electricity transmission network built by RTE in Soorts-Hossegor, south-western France on January 13, 2025. An operation to evict opponents of the construction of an extra-high-voltage power line between France and Spain was underway in the Landes region on January 16, 2025, with a prefectoral decree mandating the gendarmerie to evacuate these activists perched on trees. (Photo by Gaizka IROZ / AFP) (Photo by GAIZKA IROZ/AFP via Getty Images)